课程
学院导航
课程搜索
学士学位
硕士学位
博士学位
其他课程
招生
本科生招生
硕士研究生招生
留学生招生
学院及行政机构
学院
行政机构
其他机构
新闻信息
学术与创新新闻
要闻聚焦
优秀教师风采
奖项与荣誉
研讨会
校领导新闻
招聘信息
采购信息
活動日曆
COVID-19 and PM2.5
体育运动
要闻
健康
法律法规制度
慈善捐赠
科技信息新闻
宗教
期刊
CMU 60周年庆相关文章
清迈大学概览
发展历程
宗旨/ 愿景/ 使命/ 价值观和校园文化
Authority
清迈大学校徽
组织机构框架与管理
清迈大学教育发展五年计划
理事会
学校领导
职工委员会
其他相關連結
CMU First Year
IT网络服务
交换项目
奖学金
新闻信息图库
Open Data Integrity and Transparency Assessment : OIT
Privacy Policy
Code of Ethics
CMU's Emergency Prevention and Response Plan.
Complaint channels for the Office of The National Anti - Corruption Commission (ONACC)
Complaint channels for the Office of Public Sector Anti-Corruption Commission (PACC)
Channels for providing feedback/complaints/information on corruption at Chiang Mai University.
联系方式
ภาษา
泰语
英语
中文
TH
|
EN
|
CN
Home
新闻信息
新闻信息
Chiang Mai University Prepares to Host Workshop and Panel Discussion on “Transitioning from Traditional AEC Workflow to BIM Workflow” to Elevate Construction Towards Sustainability
2026年11月18日
智能校园管理中心
Chiang Mai University Prepares to Host Workshop and Panel Discussion on “Transitioning from Traditional AEC Workflow to BIM Workflow” to Elevate Construction Towards Sustainability
The Center for Sustainable Urban Management, Chiang Mai University, is preparing to organize a workshop and panel discussion titled “Transitioning from Traditional AEC Workflow to BIM Workflow” to drive the adoption of technology to improve design and construction processes within the university.
Currently, the Architecture, Engineering, and Construction (AEC) industry is transitioning from traditional workflows relying on 2D drawings to Building Information Modeling (BIM). This system utilizes a building information model as a shared central database throughout the project lifecycle. It helps efficiently detect design errors before construction, reduce on-site rework, estimate quantities, and track progress.
Chiang Mai University, which has continuous construction and building renovation projects, recognizes the issues associated with traditional workflows,
such as conflicting construction drawings, disjointed communication among stakeholders, and incomplete building data upon handover,
which negatively impact both time and budget. Therefore, this project is organized with the following primary objectives:
* To equip participants with knowledge and understanding of BIM concepts and the differences between Traditional AEC Workflow and BIM Workflow.
* To ensure participants understand BIM working structures such as the BIM Execution Plan (BEP), Level of Development/Level of Information Need (LOD/LOIN),
Common Data Environment (CDE), and open data standards (IFC).
* To provide a platform for gathering opinions and suggestions from designers, supervisors, and contractors regarding problems, obstacles,
and the support needed from the university to utilize BIM across the entire construction process.
The project targets 59 participants, including engineers, architects, and related personnel from both inside and outside Chiang Mai University.
It is scheduled to take place on Thursday, November 12, 2026, from 09:00 to 13:00 hrs. at the Phraya Srivisarnvacha Meeting Room, 1st Floor, Chiang Mai University Office Building.
Activities at the event will include sharing experiences in both design and construction, as well as a panel discussion on the topic "Developing BIM Workflow in Construction".
The outcomes of this workshop and discussion will be used as supporting data to establish guidelines and plans for implementing BIM in the university's future construction projects.
This aims to enhance operational efficiency, reduce errors, and tangibly respond to the mission of sustainable urban management
要闻聚焦
Gallery
×
RoomID:
Room Name:
Description: